DESCRIPTION

The following steps were followed to complete the job:

  • Grinding of the frated concrete surface
  • Placing and sealing of PVC bowls in all drains
  • Primer Combination
  • Sealings
  • Hotsprayed Poliurethane membrane
  • Double 300g/m2 poliéster geotextile
  • 8 cm Thermal insulation
  • Double 300g/m2 poliéster geotextile
  • Heavy protection based on washed river gravel

Contractor / Owner: INCARPLOSA
Date: 2019
Place: CUENCA